QUANTITY SURVEY TRAINING AND CERTIFICATION

 

PROCEDURE OF ESTIMATION

 

Introduction

  1. Metric system and primary units
  2. International system of units
  3. Methods of estimation
  4. Main items of work
  5. Deduction of opening etc
  6. R.C.C and R.B work
  7. Flooring and Roofing
  8. Plastering and Pointing
  9. Pillars, Doors and Windows, Wood work
  10. Iron work, White washing, Colour washing
  11. Distempering, Painting, Lumpsum items, Rates
  12. Reducing calculation, Degree of accuracy
  13. Units of measurements, units of works
  14. Sizes and dimensions of various works, modular bricks
  15. Traditional bricks and thickness of wall

METHOD OF BUILDING ESTIMATES

  1. Estimate of walls by sepereate and centre line method
  2. Estimate of stair cases

ESTIMATE OF BUILDINGS

  1. Estimate of masonry platform, estimate of masonry tank
  2. Estimate of single room with verandah
  3. Estimate of two roomed building
  4. Estimate of three roomed building
  5. Estimate of an office building
  6. Estimate of shop building

RCC WORKS AND STRUCTURES

  1. R.C.C work
  2. Percentage steel reinforcement
  3. Standard hooks and cranks of reinforcement
  4. Estimate of R.C.C slab
  5. Beam
  6. Column and foundation

SANITARY AND WATER SUPPLY WORKS

  1. Sanitary works
  2. Soak pit
  3. Septic tank
  4. Water supply pipe line

ANALYSIS OF RATES

  1. Labour required for different works
  2. Materials for cement concrete preparing analysis of rates
  3. Excavation rates

SPECIFICATIONS

  1. General specifications of 1st class, 2nd class, 3rd class and 4th class materials

RULES AND METHODS OF MEASUREMENT

  1. General rules
  2. Earth work,concrete
  3. Stone masonry
  4. Brickwork,
  5. Carpenter work
  6. Steel and Iron work
  7. Roof covering
  8. Ceiling, Floor, Plastering, White washing
  9. Colour washing, Painting, Sanitary and Water supply works

VALUATION

  1. Valuation
  2. Gross Income
  3. Net Income
  4. Outgoings
  5. Scrap Value
  6. Salvage Value
  7. Obsolescence
  8. Annuity
  9. Capitalized Value
  10. Years Purchase
  11. Sinking Fund
  12. Depreciation
  13. Valuation of building
  14. Method of valuation
  15. Life of various items of work
  16. Mortgage Lease
  17. Fixation of rent

PLANNING OF BUILDING AND COLONY

  1. Principle of house planning region wise, Ventilation
  2. Economy in construction, Design of building
  3. Area of cubic space for different type of buildings
  4. Planning of residential buildings, Sizes of room
  5. Floor area of rooms and heights, Arrangements of rooms, Position and purpose
  6. Height of rooms, Height of buildings, Thickness of wall
  7. Residential accommodation for various classes of employees
  8. Utilisation of space, Planning and layout of residential colony

SHEDULE OF RATES METRIC AND F.P.SYSTEM

  1. Shedule of rates earthwork concrete damp proof course
  2. Brick work, Stone work, Wood work, Mild steel
  3. Iron work, Roof work, Ceiling
  4. Plastering and Pointing
  5. Flooring, Painting
  6. Varnishing and Distempering
  7. White and Colour Washing
  8. Well work, Road work
  9. Annual repair work, Transport, Material rates